Structural supervision and multidisciplinary coordination during construction of the K2 and M2 metro stations in Mashhad, Iran.

Station platform appearance. Selected documented stage from this project; the photograph does not define the full supervision and coordination scope.

Station platform appearance. Selected documented stage from this project; the photograph does not define the full supervision and coordination scope.

Role
Structural Supervisor & Coordination Supervisor
Period
April 2019–January 2020
Methods
Structural supervision · Construction coordination
Status
Professional project experience

Decision supported

Coordinate structural supervision and follow-up across the construction assignment.

Selected documented construction stages

Follow the engineering record.

Selected documented construction stages. The available photographs show part of the overall structural supervision and coordination assignment; they do not define the extent of professional responsibility. Original visible location, date and time stamps are retained. Individual K2/M2 allocation and the order of visits are not specified.

Station excavation.
01 / Station excavation

Station excavation.

Concrete and reinforcement.
02 / Concrete and reinforcement

Concrete and reinforcement.

Concrete and reinforcement.
03 / Concrete and reinforcement

Concrete and reinforcement.

Site-office drawing context.
04 / Site-office drawing context

Site-office drawing context.

Site-office drawing context.
05 / Site-office drawing context

Site-office drawing context.

Tunnel and track.
06 / Tunnel and track

Tunnel and track.

Site visit context.
07 / Site visit context

Site visit context.

Station platform appearance.
08 / Station platform appearance

Station platform appearance.

Supplied design context. Contextual design illustration; image authorship and as-built correspondence are not established.
09 / Supplied design context

Supplied design context. Contextual design illustration; image authorship and as-built correspondence are not established.

Supplied design context. Contextual design illustration; image authorship and as-built correspondence are not established.
10 / Supplied design context

Supplied design context. Contextual design illustration; image authorship and as-built correspondence are not established.

Supplied design context. Contextual design illustration; image authorship and as-built correspondence are not established.
11 / Supplied design context

Supplied design context. Contextual design illustration; image authorship and as-built correspondence are not established.

Engineering record

Scope, method and evidence.

Photographs show selected documented construction stages, not the complete assignment scope. Structural-design authorship, concealed conditions, test completion and final approval are not inferred from photographs.

01Supervision and coordination scope

Structural supervision and multidisciplinary coordination during construction of the K2 and M2 metro stations in Mashhad, Iran.

Context: Metro infrastructure.

02Professional role

Structural Supervisor & Coordination Supervisor

Structural supervision and coordination concern the overall construction assignment. The available photographs show selected documented construction stages and do not define the full extent of professional responsibility.

03Available project record

The project record identifies structural supervision and multidisciplinary coordination during construction of the K2 and M2 metro stations in Mashhad. Specific calculations, software, test results and quantified outcomes are not established.

The project role and overall supervision scope are confirmed by Sina. Available stage records and correspondence are interpreted alongside the photographic record.

04What the photographs establish

Photographs show selected documented construction stages, not the complete assignment scope. Structural-design authorship, concealed conditions, test completion and final approval are not inferred from photographs.

Your next engineering question

Let’s define
the work.

An asset to verify. A response to understand.
A workflow to make repeatable.

Discuss a project